{"id":1820,"date":"2018-10-10T15:03:58","date_gmt":"2018-10-10T19:03:58","guid":{"rendered":"https:\/\/web.uri.edu\/capitalprojects\/?page_id=1820"},"modified":"2025-02-07T18:59:15","modified_gmt":"2025-02-07T18:59:15","slug":"ocp-projects","status":"publish","type":"page","link":"https:\/\/web.uri.edu\/capitalprojects\/ocp-projects\/","title":{"rendered":"OCP Projects"},"content":{"rendered":"\n<h2 class=\"wp-block-heading\"><strong>College of Engineering Building<\/strong><\/h2>\n\n\n\n<div class=\"wp-block-media-text has-media-on-the-right is-stacked-on-mobile\"><div class=\"wp-block-media-text__content\">\n<p><strong>Campus:<\/strong> Kingston<br><strong>Completion Date:<\/strong> Fall 2019<br><strong>Status:<\/strong> Close-out<br><strong>Project Type:<\/strong> New Construction<br><strong>Architect:<\/strong> Ballinger<br><strong>Contractor:<\/strong> Dimeo Construction<br><strong>Project Manager:<\/strong> Jim Devol<br><strong>Construction Cost:<\/strong> $146,995,148<\/p>\n<\/div><figure class=\"wp-block-media-text__media\"><img loading=\"lazy\" decoding=\"async\" width=\"300\" height=\"153\" src=\"https:\/\/web.uri.edu\/capitalprojects\/wp-content\/uploads\/sites\/1632\/College-of-Engineering-300x153.jpg\" alt=\"College of Engineering building on a sunny day\" class=\"wp-image-1841 size-medium\" srcset=\"https:\/\/web.uri.edu\/capitalprojects\/wp-content\/uploads\/sites\/1632\/College-of-Engineering-300x153.jpg 300w, https:\/\/web.uri.edu\/capitalprojects\/wp-content\/uploads\/sites\/1632\/College-of-Engineering.jpg 768w\" sizes=\"auto, (max-width: 300px) 100vw, 300px\" \/><\/figure><\/div>\n\n\n\n<h4 class=\"wp-block-heading\"><strong>Project Description:<\/strong><\/h4>\n\n\n\n<p>This building will be 190,000 square feet and will house seven engineering programs: biomedical, chemical, civil, computer, electrical, industrial and systems, and mechanical engineering. The ground floor will house 3 active learning classrooms, vibration-proof core laboratories, and a cleanroom. The building will also offer a student shop, a cafe, computer labs, and electronic student centers. The goal is to achieve the LEED \u201cSilver\u201d certification.<\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<h2 class=\"wp-block-heading\">Brookside Apartments<\/h2>\n\n\n\n<div class=\"wp-block-media-text has-media-on-the-right is-stacked-on-mobile\"><div class=\"wp-block-media-text__content\">\n<p><strong>Campus:<\/strong> Kingston<br><strong>Completion Date:<\/strong>&nbsp;Winter 2020<br><strong>Status:<\/strong> Construction<br><strong>Project Type:<\/strong> New construction<br><strong>Architect:<\/strong> Sasaki Associates, Inc.<br><strong>Contractor:<\/strong> Bacon Construction<br><strong>Project Manager:<\/strong> Mark Fisher<br><strong>Construction Cost:<\/strong> $89,945,596<\/p>\n<\/div><figure class=\"wp-block-media-text__media\"><img loading=\"lazy\" decoding=\"async\" width=\"300\" height=\"169\" src=\"https:\/\/web.uri.edu\/capitalprojects\/wp-content\/uploads\/sites\/1632\/Brookside-300x169.jpg\" alt=\"Brookside apartments rendering\" class=\"wp-image-1832 size-medium\" srcset=\"https:\/\/web.uri.edu\/capitalprojects\/wp-content\/uploads\/sites\/1632\/Brookside-300x169.jpg 300w, https:\/\/web.uri.edu\/capitalprojects\/wp-content\/uploads\/sites\/1632\/Brookside.jpg 576w\" sizes=\"auto, (max-width: 300px) 100vw, 300px\" \/><\/figure><\/div>\n\n\n\n<h4 class=\"wp-block-heading\"><strong>Project Description:<\/strong><\/h4>\n\n\n\n<p>This facility will hold 500 beds, a cafe and will be roughly 203,000 square feet. The facility will include an outdoor seating area that will run along a restored brook. The buildings will feature apartment suites of six and four bedrooms; they will have a full kitchen, 2 bathrooms, and be fully furnished. The facility will also have a demonstration\/teaching kitchen, a presentation room, and a multi-purpose room. Their target is to achieve LEED \u201cSilver\u201d certification.<\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<h2 class=\"wp-block-heading\">Meade Stadium Turf &amp; Lighting<\/h2>\n\n\n\n<div class=\"wp-block-media-text has-media-on-the-right is-stacked-on-mobile\"><div class=\"wp-block-media-text__content\">\n<p><strong>Campus:<\/strong> Kingston<br><strong>Completion Date:<\/strong> Fall 2019<br><strong>Status:<\/strong>&nbsp;Close-out<br><strong>Project Type:<\/strong> Renovation<br><strong>Architect:<\/strong> Gordon R. Archibald, Inc.<br><strong>Contractor:<\/strong> DiGregorio Corp Project<br><strong>Manager:<\/strong> Robert Schultz Construction<br><strong>Cost:<\/strong>&nbsp;$3,995,000<\/p>\n<\/div><figure class=\"wp-block-media-text__media\"><img loading=\"lazy\" decoding=\"async\" width=\"300\" height=\"225\" src=\"https:\/\/web.uri.edu\/capitalprojects\/wp-content\/uploads\/sites\/1632\/Meade-Stadium-1-300x225.jpg\" alt=\"Meade Stadium with a fiery pink, orange, and yellow sunset in the background\" class=\"wp-image-2508 size-medium\" srcset=\"https:\/\/web.uri.edu\/capitalprojects\/wp-content\/uploads\/sites\/1632\/Meade-Stadium-1-300x225.jpg 300w, https:\/\/web.uri.edu\/capitalprojects\/wp-content\/uploads\/sites\/1632\/Meade-Stadium-1-768x576.jpg 768w, https:\/\/web.uri.edu\/capitalprojects\/wp-content\/uploads\/sites\/1632\/Meade-Stadium-1-1024x768.jpg 1024w, https:\/\/web.uri.edu\/capitalprojects\/wp-content\/uploads\/sites\/1632\/Meade-Stadium-1.jpg 2309w\" sizes=\"auto, (max-width: 300px) 100vw, 300px\" \/><\/figure><\/div>\n\n\n\n<h4 class=\"wp-block-heading\">Project Description:<\/h4>\n\n\n\n<p>This project will involve the installation of synthetic turf and stadium lighting to support evening events. The renovations will provide a durable field and create a variety of options for the school and community during various events. Synthetic turf provides a strong surface; which will allow repetitive use, as well as immediate use after harsh weather conditions.<\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<h2 class=\"wp-block-heading\">Bike Path Connector<\/h2>\n\n\n\n<div class=\"wp-block-media-text has-media-on-the-right is-stacked-on-mobile\" style=\"grid-template-columns:auto 38%\"><div class=\"wp-block-media-text__content\">\n<p><strong>Campus:<\/strong> Kingston<br><strong>Completion Date:<\/strong> Fall 2019<br><strong>Status:<\/strong> Construction<br><strong>Project Type:<\/strong> New construction<br><strong>Architect:<\/strong> Pare Corporation<br><strong>Contractor:<\/strong> Narragansett Improvement Company<br><strong>Project Manager:<\/strong>&nbsp;Robert Schultz<br><strong>Construction Cost:<\/strong> $2,434,000<\/p>\n<\/div><figure class=\"wp-block-media-text__media\"><img loading=\"lazy\" decoding=\"async\" width=\"300\" height=\"300\" src=\"https:\/\/web.uri.edu\/capitalprojects\/wp-content\/uploads\/sites\/1632\/bike-lane-300x300.jpg\" alt=\"bike path\" class=\"wp-image-1829 size-medium\" srcset=\"https:\/\/web.uri.edu\/capitalprojects\/wp-content\/uploads\/sites\/1632\/bike-lane-300x300.jpg 300w, https:\/\/web.uri.edu\/capitalprojects\/wp-content\/uploads\/sites\/1632\/bike-lane-150x150.jpg 150w, https:\/\/web.uri.edu\/capitalprojects\/wp-content\/uploads\/sites\/1632\/bike-lane.jpg 600w\" sizes=\"auto, (max-width: 300px) 100vw, 300px\" \/><\/figure><\/div>\n\n\n\n<h4 class=\"wp-block-heading\"><strong>Project Description:<\/strong><\/h4>\n\n\n\n<p>This bike path will run from the O\u2019Neill Bike Path along the western border of Peckham Farm, across Rte 138 and through campus to the new Brookside Apartment complex. This new bike path is a key element to the&nbsp;University\u2019s&nbsp;Campus Master Plan, which calls for enhanced pedestrian and improved bicycle access around campus, including bike lanes on campus roads and additional bike racks.<\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<h2 class=\"wp-block-heading\">Fine Arts Center \u2013 Phase 1<\/h2>\n\n\n\n<div class=\"wp-block-media-text has-media-on-the-right is-stacked-on-mobile\"><div class=\"wp-block-media-text__content\">\n<p><strong>Campus:<\/strong>&nbsp;Kingston<br><strong>Completion Date:<\/strong>&nbsp;Sept 2019<br><strong>Status:<\/strong>&nbsp;Construction<br><strong>Project Type:<\/strong> Renovations<br><strong>Architect:<\/strong>&nbsp;Kallmann Mckinnel &amp; Wood<br><strong>Contractor:<\/strong>&nbsp;Ahlborg Construction Corp.<br><strong>Project Manager:<\/strong>&nbsp;Mike Steinbrecher<br><strong>Construction Cost:<\/strong> $12,000,000<\/p>\n<\/div><figure class=\"wp-block-media-text__media\"><img loading=\"lazy\" decoding=\"async\" width=\"300\" height=\"195\" src=\"https:\/\/web.uri.edu\/capitalprojects\/wp-content\/uploads\/sites\/1632\/FineArtsCenter20051-300x195.jpg\" alt=\"Fine Arts Center\" class=\"wp-image-1844 size-medium\" srcset=\"https:\/\/web.uri.edu\/capitalprojects\/wp-content\/uploads\/sites\/1632\/FineArtsCenter20051-300x195.jpg 300w, https:\/\/web.uri.edu\/capitalprojects\/wp-content\/uploads\/sites\/1632\/FineArtsCenter20051-768x500.jpg 768w, https:\/\/web.uri.edu\/capitalprojects\/wp-content\/uploads\/sites\/1632\/FineArtsCenter20051.jpg 887w\" sizes=\"auto, (max-width: 300px) 100vw, 300px\" \/><\/figure><\/div>\n\n\n\n<h4 class=\"wp-block-heading\"><strong>Project Description:<\/strong><\/h4>\n\n\n\n<p>This project is to make improvements to the 120,720 square foot facility; to continue to house the Music, theatre, visual and graphic arts programs.<\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<h2 class=\"wp-block-heading\"><strong>Fraternity Circle Infrastructure<\/strong><\/h2>\n\n\n\n<div class=\"wp-block-media-text has-media-on-the-right is-stacked-on-mobile\"><div class=\"wp-block-media-text__content\">\n<p><strong>Campus:<\/strong> Kingston<br><strong>Completion Date:<\/strong> Fall 2019<br><strong>Status:<\/strong> Construction<br><strong>Project Type:<\/strong> Renovations<br><strong>Architect:<\/strong> Vanasse Hangen Brustlin Inc. <strong>Contractor:<\/strong> Manafort Brothers, Inc.<br><strong>Project Manager:<\/strong> Robert Schultz<br><strong>Construction Cost:<\/strong> $5,053,670<\/p>\n<\/div><figure class=\"wp-block-media-text__media\"><img loading=\"lazy\" decoding=\"async\" width=\"300\" height=\"169\" src=\"https:\/\/web.uri.edu\/capitalprojects\/wp-content\/uploads\/sites\/1632\/Fraternity-Circle-Map.pptx-300x169.jpg\" alt=\"Fraternity Circle Map\" class=\"wp-image-1847 size-medium\" srcset=\"https:\/\/web.uri.edu\/capitalprojects\/wp-content\/uploads\/sites\/1632\/Fraternity-Circle-Map.pptx-300x169.jpg 300w, https:\/\/web.uri.edu\/capitalprojects\/wp-content\/uploads\/sites\/1632\/Fraternity-Circle-Map.pptx-768x432.jpg 768w, https:\/\/web.uri.edu\/capitalprojects\/wp-content\/uploads\/sites\/1632\/Fraternity-Circle-Map.pptx-1024x576.jpg 1024w, https:\/\/web.uri.edu\/capitalprojects\/wp-content\/uploads\/sites\/1632\/Fraternity-Circle-Map.pptx.jpg 1280w\" sizes=\"auto, (max-width: 300px) 100vw, 300px\" \/><\/figure><\/div>\n\n\n\n<h4 class=\"wp-block-heading\"><strong>Project Description:<\/strong><\/h4>\n\n\n\n<p>This project will be used to redesign the fraternity circle site and utilities.<\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<h2 class=\"wp-block-heading\">Chafee Broadcast Studio Renovations<\/h2>\n\n\n\n<div class=\"wp-block-media-text has-media-on-the-right is-stacked-on-mobile\"><div class=\"wp-block-media-text__content\">\n<p><strong>Campus:<\/strong> Kingston<br><strong>Completion Date:<\/strong> Sept 2019<br><strong>Status:<\/strong> Completed<br><strong>Project Type:<\/strong> Renovation<br><strong>Architect:<\/strong> TLB Architects<br><strong>Contractor:<\/strong> Tower Construction<br><strong>Project Manager:<\/strong> Schane Tallardy<br><strong>Construction Cost:<\/strong>&nbsp;$1,060,700<\/p>\n<\/div><figure class=\"wp-block-media-text__media\"><img loading=\"lazy\" decoding=\"async\" width=\"300\" height=\"200\" src=\"https:\/\/web.uri.edu\/capitalprojects\/wp-content\/uploads\/sites\/1632\/broadcast-studio-300x200.jpg\" alt=\"inside a broadcast studio with many digital screens\" class=\"wp-image-2541 size-medium\" srcset=\"https:\/\/web.uri.edu\/capitalprojects\/wp-content\/uploads\/sites\/1632\/broadcast-studio-300x200.jpg 300w, https:\/\/web.uri.edu\/capitalprojects\/wp-content\/uploads\/sites\/1632\/broadcast-studio.jpg 700w\" sizes=\"auto, (max-width: 300px) 100vw, 300px\" \/><\/figure><\/div>\n\n\n\n<h4 class=\"wp-block-heading\">Project Description:<\/h4>\n\n\n\n<p>This project will renovate the current studio into a first of its kind video\/sound recording and broadcast center across the state. These changes will include a fully robotic camera, updated audio board, new cameras, new lights, and a new news set. The new studio will give students a better learning curriculum and better opportunities for job placement.<\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<h2 class=\"wp-block-heading\">NBC Pier Reconstruction<\/h2>\n\n\n\n<div class=\"wp-block-media-text has-media-on-the-right is-stacked-on-mobile\"><div class=\"wp-block-media-text__content\">\n<p><strong>Campus:<\/strong> Narragansett Bay<br><strong>Completion Date:<\/strong> Winter 2021<br><strong>Status:<\/strong> Pre-construction<br><strong>Project Type:<\/strong> Reconstruction<br><strong>Architect:<\/strong> Appledore<br><strong>Contractor:<\/strong> TBD<br><strong>Project Manager:<\/strong> Ken Burke<br><strong>Construction Cost:<\/strong>&nbsp;$750,000<\/p>\n<\/div><figure class=\"wp-block-media-text__media\"><img loading=\"lazy\" decoding=\"async\" width=\"300\" height=\"225\" src=\"https:\/\/web.uri.edu\/capitalprojects\/wp-content\/uploads\/sites\/1632\/NBC-Pier-300x225.jpg\" alt=\"NBC Pier from an aerial point of view\" class=\"wp-image-2535 size-medium\" srcset=\"https:\/\/web.uri.edu\/capitalprojects\/wp-content\/uploads\/sites\/1632\/NBC-Pier-300x225.jpg 300w, https:\/\/web.uri.edu\/capitalprojects\/wp-content\/uploads\/sites\/1632\/NBC-Pier-768x576.jpg 768w, https:\/\/web.uri.edu\/capitalprojects\/wp-content\/uploads\/sites\/1632\/NBC-Pier-1024x768.jpg 1024w, https:\/\/web.uri.edu\/capitalprojects\/wp-content\/uploads\/sites\/1632\/NBC-Pier.jpg 1280w\" sizes=\"auto, (max-width: 300px) 100vw, 300px\" \/><\/figure><\/div>\n\n\n\n<h4 class=\"wp-block-heading\">Project Description:<\/h4>\n\n\n\n<p>This renovated pier will be home to the new Regional Class Research Vessel, Resolution.&nbsp; This project will include removal of the existing wood pier and addition of steel-encased concrete piles and decking. The pier needs to be long enough to house a crane and high enough to counter the threat of rising sea levels.<\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<h2 class=\"wp-block-heading\"><strong>Re-paving and Road Construction of Upper\/Lower College Rd<\/strong><\/h2>\n\n\n\n<div class=\"wp-block-media-text has-media-on-the-right is-stacked-on-mobile\"><div class=\"wp-block-media-text__content\">\n<p><strong>Campus:<\/strong> Kingston<br><strong>Completion Date:<\/strong> TBD<br><strong>Status:<\/strong> Pre-construction<br><strong>Project Type:<\/strong> Renovation<br><strong>Designer:<\/strong>&nbsp;Gordon R. Archibald<br><strong>Contractor:<\/strong> TBD<br><strong>Project Manager:<\/strong> Ken Burke<br><strong>Construction Cost:<\/strong> $4,253,551<\/p>\n<\/div><figure class=\"wp-block-media-text__media\"><img loading=\"lazy\" decoding=\"async\" width=\"300\" height=\"147\" src=\"https:\/\/web.uri.edu\/capitalprojects\/wp-content\/uploads\/sites\/1632\/IMG_9059-300x147.jpg\" alt=\"Upper College Rd. on URI's Kingston Campus\" class=\"wp-image-1856 size-medium\" srcset=\"https:\/\/web.uri.edu\/capitalprojects\/wp-content\/uploads\/sites\/1632\/IMG_9059-300x147.jpg 300w, https:\/\/web.uri.edu\/capitalprojects\/wp-content\/uploads\/sites\/1632\/IMG_9059-768x376.jpg 768w, https:\/\/web.uri.edu\/capitalprojects\/wp-content\/uploads\/sites\/1632\/IMG_9059.jpg 873w\" sizes=\"auto, (max-width: 300px) 100vw, 300px\" \/><\/figure><\/div>\n\n\n\n<h4 class=\"wp-block-heading\"><strong>Project Description:<\/strong><\/h4>\n\n\n\n<p>This project is to improve existing roads and parking lots. Roads and parking lots included in renovations are Lower College Rd, E. Alumni Ave &amp; Powerhouse Rd, Upper College Rd, Green Hall parking lot, W. Alumni Ave, campus sidewalks, 210 Flagg Rd lot, etc.<\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<h2 class=\"wp-block-heading\">Robert J Higgins Welcome Center<\/h2>\n\n\n\n<div class=\"wp-block-media-text has-media-on-the-right is-stacked-on-mobile\"><div class=\"wp-block-media-text__content\">\n<p><strong>Campus:<\/strong> Kingston<br><strong>Completion Date:<\/strong> September 2018<br><strong>Status:<\/strong> Completed<br><strong>Project Type:<\/strong> New construction<br><strong>Architect:<\/strong> Durkee, Brown, Viveiros &amp; Werenfels<br><strong>Contractor:<\/strong> E.W. Burman<br><strong>Project Manager:<\/strong> Schane Tallardy<br><strong>Construction Cost:<\/strong> $8,728,000<\/p>\n<\/div><figure class=\"wp-block-media-text__media\"><img loading=\"lazy\" decoding=\"async\" width=\"300\" height=\"200\" src=\"https:\/\/web.uri.edu\/capitalprojects\/wp-content\/uploads\/sites\/1632\/Welcome-center-300x200.jpg\" alt=\"Robert J Higgins Welcome Center at URI on a sunny day. A ram statue sits in front of the building\" class=\"wp-image-1775 size-medium\" srcset=\"https:\/\/web.uri.edu\/capitalprojects\/wp-content\/uploads\/sites\/1632\/Welcome-center-300x200.jpg 300w, https:\/\/web.uri.edu\/capitalprojects\/wp-content\/uploads\/sites\/1632\/Welcome-center-768x512.jpg 768w, https:\/\/web.uri.edu\/capitalprojects\/wp-content\/uploads\/sites\/1632\/Welcome-center-1024x683.jpg 1024w\" sizes=\"auto, (max-width: 300px) 100vw, 300px\" \/><\/figure><\/div>\n\n\n\n<h4 class=\"wp-block-heading\"><strong>Project Description:<\/strong><\/h4>\n\n\n\n<p>This facility will help to welcome visitors to the Kingston Campus. The building will be the starting point for people who visit campus on their own as well as planned tours of campus. It will also offer space for admissions staff which includes office space, presentation rooms, conference rooms, and digital screens.<\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<h2 class=\"wp-block-heading\"><strong>Beaupre Center for Chemical &amp; Forensic Sciences<\/strong><\/h2>\n\n\n\n<div class=\"wp-block-media-text has-media-on-the-right is-stacked-on-mobile\"><div class=\"wp-block-media-text__content\">\n<p><strong>Campus:<\/strong> Kingston<br><strong>Completion Date:<\/strong> Sept 2016<br><strong>Project Type:<\/strong> New Construction<br><strong>Architect:<\/strong> Wilson Architects<br><strong>Project Manager:<\/strong> Mark Fisher<br><strong>Contractor:<\/strong> Bacon Construction<br><strong>Construction Cost:<\/strong> $68,644,000<\/p>\n<\/div><figure class=\"wp-block-media-text__media\"><img loading=\"lazy\" decoding=\"async\" width=\"450\" height=\"300\" src=\"https:\/\/web.uri.edu\/capitalprojects\/wp-content\/uploads\/sites\/1632\/Chem-building.jpg\" alt=\"Chem building and walkway\" class=\"wp-image-1826 size-full\" srcset=\"https:\/\/web.uri.edu\/capitalprojects\/wp-content\/uploads\/sites\/1632\/Chem-building.jpg 450w, https:\/\/web.uri.edu\/capitalprojects\/wp-content\/uploads\/sites\/1632\/Chem-building-300x200.jpg 300w\" sizes=\"auto, (max-width: 450px) 100vw, 450px\" \/><\/figure><\/div>\n\n\n\n<h4 class=\"wp-block-heading\"><strong>Project Description:<\/strong><\/h4>\n\n\n\n<p>This building is&nbsp; 134,623 square feet and houses the Department of Chemistry and the Center of Excellence for Explosives Detection, Mitigation and Response. It has 14 teaching laboratories, 18 faculty research labs, 2 lecture halls, classrooms, and the Teknor Apex Instrumentation Lab. The building also achieved LEED \u201cGold\u201d certification.<\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<div style=\"height:50px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<h1 class=\"wp-block-heading\"><strong>Smaller or Upcoming Projects<\/strong><\/h1>\n\n\n\n<p>5 Generator Project <em>(completed)<\/em> &#8211; $657,000<\/p>\n\n\n\n<p>Buterfield Rd &amp; Hope Drainage Improvements <em>(TBD)<\/em> &#8211; $780,000<\/p>\n\n\n\n<p>Campus Fire Escape Repairs <em>(TBD)<\/em> &#8211; TBD Carothers Library Renovations <em>(underway)<\/em> &#8211; $839,000<\/p>\n\n\n\n<p>CAS Dean&#8217;s Suite Renovations <em>(completed)<\/em> &#8211; $464,000<\/p>\n\n\n\n<p>CHS Dean&#8217;s Suite Renovations <em>(completed)<\/em> &#8211; $630,800<\/p>\n\n\n\n<p>Coastal Institute Renovations of Electrical Rooms <em>(upcoming)<\/em> &#8211; TBD<\/p>\n\n\n\n<p>Complex Road Utilities <em>(TBD)<\/em> &#8211; $756,000<\/p>\n\n\n\n<p>Davis Hall Exterior Renovations <em>(underway)<\/em> &#8211; $1,562,000<\/p>\n\n\n\n<p>DCAMM Fuel Depot <em>(TBD)<\/em> &#8211; $700,000<\/p>\n\n\n\n<p>Farmhouse Rd &amp; Hammerschlag Mall Steam <em>(TBD)<\/em> &#8211; $2,200,000<\/p>\n\n\n\n<p>Fayerweather &amp; Gorham Mechanical Room <em>(underway)<\/em> &#8211; $715,000<\/p>\n\n\n\n<p>Golf Training Facility <em>(TBD)<\/em> &#8211; $961,500<\/p>\n\n\n\n<p>Grad Village Stairs <em>(underway<\/em>) &#8211; $360,000<\/p>\n\n\n\n<p>Green Hall Parking Lot <em>(underway)<\/em> &#8211; $575,000<\/p>\n\n\n\n<p>Heathman Hall Student Lounge Renovation <em>(underway)<\/em> &#8211; $1,525,000<\/p>\n\n\n\n<p>Heathman Hall Masonry Repairs <em>(underway)<\/em> &#8211; $1,614,000<\/p>\n\n\n\n<p>HRL Roofs &#8211; Aldrich, Burnside, Adams&nbsp;<em>(underway)<\/em> &#8211; $1,528,000<\/p>\n\n\n\n<p>HRL Roofs &#8211; Coddington, Dorr, Ellery, Hopkins <em>(underway)<\/em> &#8211; $2,543,000<\/p>\n\n\n\n<p>HRL Security Camera Project <em>(TBD)<\/em> &#8211; $1,985,000<\/p>\n\n\n\n<p>HRL Warehouse <em>(completed)<\/em> &#8211; $1,500,000<\/p>\n\n\n\n<p>Keaney-ROTC classrooms <em>(completed)<\/em> &#8211; $289,000<\/p>\n\n\n\n<p>Kirk Hall Electrical Improvements <em>(underway)<\/em> &#8211; $85,000<\/p>\n\n\n\n<p>Kirk Hall HVAC Improvements <em>(underway)<\/em> &#8211; $183,000<\/p>\n\n\n\n<p>Lower College Rd Improvements <em>(completed)<\/em> &#8211; $1,700,000<\/p>\n\n\n\n<p>Mackal Flooring<em> (completed)<\/em> &#8211; $183,000<\/p>\n\n\n\n<p>Mosby Center <em>(completed)<\/em> &#8211; $475,200<\/p>\n\n\n\n<p>Pharmacy GMP <em>(TBD)<\/em>&nbsp;&#8211; $90,000<\/p>\n\n\n\n<p>Police Station &#8211; Lobby Renovations<em> (TBD)<\/em> &#8211; TBD<\/p>\n\n\n\n<p>Rodman Exterior Improvements <em>(underway)<\/em> &#8211; $1,142,000<\/p>\n\n\n\n<p>Roger Williams Complex Generator Project <em>(underway)<\/em> &#8211; $4,900,000<\/p>\n\n\n\n<p>Ryan Center Fire Protection Renovations <em>(underway)<\/em> &#8211; $583,000<\/p>\n\n\n\n<p>Sycamore Lodge Roof &#8211; W. Alton Jones <em>(TBD)<\/em>&#8211; TBD<\/p>\n\n\n\n<p>Tootell Aquatics Center <em>(underway)<\/em> &#8211; TBD<\/p>\n\n\n\n<p>Tootell Pool Resurface and Repair <em>(underway)<\/em> &#8211; $608,000<\/p>\n\n\n\n<p>URI Water Tank Painting <em>(TBD)<\/em> &#8211; $1,900,000<\/p>\n\n\n\n<p>URI Well Development &#8211; Well #3 <em>(underway) <\/em>$798,000<\/p>\n\n\n\n<p>Watson House Roof <em>(underway)<\/em> &#8211; $140,000<\/p>\n\n\n\n<p>White Hall HVAC Upgrades <em>(TBD)<\/em> &#8211; $2,5000,000<\/p>\n","protected":false},"excerpt":{"rendered":"<p>College of Engineering Building Campus: KingstonCompletion Date: Fall 2019Status: Close-outProject Type: New ConstructionArchitect: BallingerContractor: Dimeo ConstructionProject Manager: Jim DevolConstruction Cost: $146,995,148 Project Description: This building will be 190,000 square feet and will house seven engineering programs: biomedical, chemical, civil, computer, electrical, industrial and systems, and mechanical engineering. The ground floor will house 3 active learning [&hellip;]<\/p>\n","protected":false},"author":2275,"featured_media":0,"parent":0,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"footnotes":"","_links_to":"","_links_to_target":""},"class_list":["post-1820","page","type-page","status-publish","hentry"],"acf":[],"_links":{"self":[{"href":"https:\/\/web.uri.edu\/capitalprojects\/wp-json\/wp\/v2\/pages\/1820","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/web.uri.edu\/capitalprojects\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/web.uri.edu\/capitalprojects\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/web.uri.edu\/capitalprojects\/wp-json\/wp\/v2\/users\/2275"}],"replies":[{"embeddable":true,"href":"https:\/\/web.uri.edu\/capitalprojects\/wp-json\/wp\/v2\/comments?post=1820"}],"version-history":[{"count":5,"href":"https:\/\/web.uri.edu\/capitalprojects\/wp-json\/wp\/v2\/pages\/1820\/revisions"}],"predecessor-version":[{"id":3388,"href":"https:\/\/web.uri.edu\/capitalprojects\/wp-json\/wp\/v2\/pages\/1820\/revisions\/3388"}],"wp:attachment":[{"href":"https:\/\/web.uri.edu\/capitalprojects\/wp-json\/wp\/v2\/media?parent=1820"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}