{"id":170735,"date":"2021-04-26T08:51:13","date_gmt":"2021-04-26T12:51:13","guid":{"rendered":"https:\/\/web.uri.edu\/gso\/?p=170735"},"modified":"2023-02-01T09:18:19","modified_gmt":"2023-02-01T14:18:19","slug":"nbcmp_phase-one","status":"publish","type":"post","link":"https:\/\/web.uri.edu\/gso\/about\/master-plan\/nbcmp_phase-one\/","title":{"rendered":"NBCMP_Phase One"},"content":{"rendered":"<div class=\"fullwidth\"><section class=\"cl-wrapper cl-hero-wrapper\"><div class=\"cl-hero   cl-has-accessibility-controls\"><div class=\"cl-hero-proper\"><div class=\"overlay\"><div class=\"block\"><h1>Master Plan: Phase One<\/h1><\/div><\/div><div class=\"still\" style=\"background-image:url(https:\/\/web.uri.edu\/wp-content\/uploads\/sites\/916\/banner_phase-one-aerial.jpg);\"><\/div><div class=\"cl-accessibility-controls-container\"><div class=\"cl-accessibility-controls\"><div class=\"cl-accessibility-icon\" title=\"Accessibility controls\">Accessibility controls<\/div><div class=\"cl-accessibility-control cl-accessibility-motion-control cl-accessibility-control-hidden\"><div class=\"cl-accessibility-control-default\"><div class=\"cl-accessibility-control-button\" title=\"Pause motion\">Pause motion<\/div><div class=\"cl-accessibility-control-label\">Motion: <span class=\"cl-accessibility-syntax\">On<\/span><\/div><\/div><div class=\"cl-accessibility-control-alternate\"><div class=\"cl-accessibility-control-button\" title=\"Play motion\">Play motion<\/div><div class=\"cl-accessibility-control-label\">Motion: <span class=\"cl-accessibility-syntax\">Off<\/span><\/div><\/div><\/div><div class=\"cl-accessibility-control cl-accessibility-contrast-control\"><div class=\"cl-accessibility-control-default\"><div class=\"cl-accessibility-control-button\" title=\"Increase text contrast\">Increase text contrast<\/div><div class=\"cl-accessibility-control-label\">Contrast: <span class=\"cl-accessibility-syntax\">Standard<\/span><\/div><\/div><div class=\"cl-accessibility-control-alternate\"><div class=\"cl-accessibility-control-button\" title=\"Reset text contrast\">Reset text contrast<\/div><div class=\"cl-accessibility-control-label\">Contrast: <span class=\"cl-accessibility-syntax\">High<\/span><\/div><\/div><\/div><div class=\"cl-accessibility-system-setting\"><div class=\"cl-accessibility-toggle\" title=\"Apply my preferences site-wide\"><\/div><div class=\"cl-accessibility-toggle-label\">Apply site-wide<\/div><\/div><\/div><\/div><\/div><\/div><\/section><\/p>\n<p class=\"type-intro\">The first three projects answer the need for facilities that will best serve the new Regional Class Research Vessel upon its arrival in 2024, and make optimal use of its advanced capabilities. Funding for these projects has already been received and\/or approved and construction has begun.<\/p>\n<\/div>\n<p><a href=\"https:\/\/web.uri.edu\/gso\/about\/master-plan\">[Return to landing page.]<\/a><\/p>\n<h2>Projects in Phase One<\/h2>\n<hr>\n<h3><a href=\"https:\/\/web.uri.edu\/gso\/uncategorized\/nbcmp_pier-for-rcrv\/\">Research Vessel Pier<\/a><\/h3>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignright size-half_column wp-image-170741\" src=\"https:\/\/web.uri.edu\/wp-content\/uploads\/sites\/916\/NBCMP_phase-one-banner-500x241.jpg\" alt=\"detail of engineer's drawing\" width=\"500\" height=\"241\" srcset=\"https:\/\/web.uri.edu\/gso\/wp-content\/uploads\/sites\/916\/NBCMP_phase-one-banner-500x241.jpg 500w, https:\/\/web.uri.edu\/gso\/wp-content\/uploads\/sites\/916\/NBCMP_phase-one-banner-300x145.jpg 300w, https:\/\/web.uri.edu\/gso\/wp-content\/uploads\/sites\/916\/NBCMP_phase-one-banner-1024x494.jpg 1024w, https:\/\/web.uri.edu\/gso\/wp-content\/uploads\/sites\/916\/NBCMP_phase-one-banner-768x371.jpg 768w, https:\/\/web.uri.edu\/gso\/wp-content\/uploads\/sites\/916\/NBCMP_phase-one-banner-364x176.jpg 364w, https:\/\/web.uri.edu\/gso\/wp-content\/uploads\/sites\/916\/NBCMP_phase-one-banner-1000x483.jpg 1000w, https:\/\/web.uri.edu\/gso\/wp-content\/uploads\/sites\/916\/NBCMP_phase-one-banner-1280x618.jpg 1280w, https:\/\/web.uri.edu\/gso\/wp-content\/uploads\/sites\/916\/NBCMP_phase-one-banner.jpg 1500w\" sizes=\"auto, (max-width: 500px) 100vw, 500px\" \/><\/p>\n<p>GSO&#8217;s original pier was built in 1963. After more than 60 years, the wooden structure was at the end of its service life. Further, planners understood it would not meet the needs of the new research vessel, <em>Narragansett Dawn.<\/em> The most practical solution was to replace the wooden pier with a larger, steel-and-concrete pier. Due to forecasts for rising sea level, the decks of the new 200-foot pier and approach road are about five feet above previous elevations. As part of the pier project, the original pump house that brings seawater to campus labs was also replaced. The new pump house has been relocated further uphill, adjacent to the Blount Aquaculture Building.<\/p>\n<h3><a href=\"https:\/\/web.uri.edu\/gso\/uncategorized\/nbcmp_marine-ops\/\">Marine Operations Facility<\/a><\/h3>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignright size-half_column wp-image-171203\" src=\"https:\/\/web.uri.edu\/wp-content\/uploads\/sites\/916\/MarineOps-3d-ovrhd-view-500x238.png\" alt=\"\" width=\"500\" height=\"238\" srcset=\"https:\/\/web.uri.edu\/gso\/wp-content\/uploads\/sites\/916\/MarineOps-3d-ovrhd-view-500x238.png 500w, https:\/\/web.uri.edu\/gso\/wp-content\/uploads\/sites\/916\/MarineOps-3d-ovrhd-view-300x143.png 300w, https:\/\/web.uri.edu\/gso\/wp-content\/uploads\/sites\/916\/MarineOps-3d-ovrhd-view-768x366.png 768w, https:\/\/web.uri.edu\/gso\/wp-content\/uploads\/sites\/916\/MarineOps-3d-ovrhd-view-364x173.png 364w, https:\/\/web.uri.edu\/gso\/wp-content\/uploads\/sites\/916\/MarineOps-3d-ovrhd-view.png 1000w\" sizes=\"auto, (max-width: 500px) 100vw, 500px\" \/><\/p>\n<p>Design development has been completed. The project will upgrade marine operations with a new building and create an annex to the Marine Logistics Building. The &#8220;Marine Ops Building&#8221; will contain offices and meeting spaces for staff of the Marine Operations department, as well as a classroom, locker rooms, equipment and storage for URI&#8217;s Diving Safety &amp; Research Program. Inside the &#8220;MLB-Annex&#8221; are three workshops (machine shop, wood shop and clean shop) and a staging area for ship&#8217;s cargo and support spaces. When built, the new structures add about 11,000 square feet of space.<\/p>\n<h3><a href=\"https:\/\/web.uri.edu\/gso\/uncategorized\/nbcmp_ocean-tech\/\">Ocean Robotics Laboratory<\/a><\/h3>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-full_column wp-image-165467\" src=\"https:\/\/web.uri.edu\/wp-content\/uploads\/sites\/916\/Building_aerial-illus-1000x439.jpg\" alt=\"\" width=\"1000\" height=\"439\" srcset=\"https:\/\/web.uri.edu\/gso\/wp-content\/uploads\/sites\/916\/Building_aerial-illus-1000x439.jpg 1000w, https:\/\/web.uri.edu\/gso\/wp-content\/uploads\/sites\/916\/Building_aerial-illus-300x132.jpg 300w, https:\/\/web.uri.edu\/gso\/wp-content\/uploads\/sites\/916\/Building_aerial-illus-1024x450.jpg 1024w, https:\/\/web.uri.edu\/gso\/wp-content\/uploads\/sites\/916\/Building_aerial-illus-768x337.jpg 768w, https:\/\/web.uri.edu\/gso\/wp-content\/uploads\/sites\/916\/Building_aerial-illus-364x160.jpg 364w, https:\/\/web.uri.edu\/gso\/wp-content\/uploads\/sites\/916\/Building_aerial-illus-500x220.jpg 500w, https:\/\/web.uri.edu\/gso\/wp-content\/uploads\/sites\/916\/Building_aerial-illus.jpg 1200w\" sizes=\"auto, (max-width: 1000px) 100vw, 1000px\" \/><\/p>\n<p>Sited at the top of the campus next to OSEC, this new building will be a prominent outcome of campus-renewal efforts. Years of program planning, design development and construction preparation have been devoted to the details of this next-generation laboratory. Groundbreaking on the 27,000-square-foot building is scheduled for Summer 2023. The Ocean Robotics Laboratory will be a hub of innovation and collaboration in a technologically-driven era of ocean exploration and research. To research and build new ocean-going devices, unique components of the lab include a 5,000-square-foot, high-bay staging area, a large test tank, two workshops, eight primary labs, eight secondary labs and an incubator suite.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Three projects comprise the first phase of the Master Plan. All three answer the need for facilities that will best serve the new Regional Class Research Vessel upon its arrival in 2023, and make optimal use of its advanced capabilities.<\/p>\n","protected":false},"author":2120,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":"","_links_to":"","_links_to_target":""},"categories":[2858],"tags":[],"class_list":["post-170735","post","type-post","status-publish","format-standard","hentry","category-master-plan"],"acf":[],"_links":{"self":[{"href":"https:\/\/web.uri.edu\/gso\/wp-json\/wp\/v2\/posts\/170735","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/web.uri.edu\/gso\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/web.uri.edu\/gso\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/web.uri.edu\/gso\/wp-json\/wp\/v2\/users\/2120"}],"replies":[{"embeddable":true,"href":"https:\/\/web.uri.edu\/gso\/wp-json\/wp\/v2\/comments?post=170735"}],"version-history":[{"count":7,"href":"https:\/\/web.uri.edu\/gso\/wp-json\/wp\/v2\/posts\/170735\/revisions"}],"predecessor-version":[{"id":179545,"href":"https:\/\/web.uri.edu\/gso\/wp-json\/wp\/v2\/posts\/170735\/revisions\/179545"}],"wp:attachment":[{"href":"https:\/\/web.uri.edu\/gso\/wp-json\/wp\/v2\/media?parent=170735"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/web.uri.edu\/gso\/wp-json\/wp\/v2\/categories?post=170735"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/web.uri.edu\/gso\/wp-json\/wp\/v2\/tags?post=170735"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}