The Rhode Island Stormwater Design and Installation Standards Manual — A detailed look at the required specifications and measures for BMP construction and maintenance

Date and Time: March 24, 2011; 8:30 am to 4:30 pm

Description: This technical training will provide the audience with specific and detailed information about elements of the 2010 RI Stormwater Design and Installation Standards Manual. Attendance at this workshop is appropriate for designers, planners, engineers, and municipal officials, but is required for MS4 compliance with Education and Outreach Minimum measures.

The training content will include: a recap of water quality BMPs; WVTS – shallow and gravel; infiltration (including permeable paving); filters; open channels; construction and maintenance summary; and a discussion, Q&A, and comment period.

Flyer (PDF)

Final agenda (PDF)

Final Attendance (PDF)

Presentation materials (PDFs):

Session 1 (Handouts – 3 per page)
Session 2 (Handouts – 3 per page)
Session 3 (Handouts – 3 per page)
Session 4 (Handouts – 3 per page)
Session 5 (Handouts – 3 per page)
Session 6 (Handouts – 3 per page)

Summary Evaluation (PDF)