The main stairway which leads from the first floor all the way to the fourth. It will be transformed into a beautiful feature stair later in the project.

Under Construction:
A Peek Inside the New Pharmacy Building

Since the start of the new building construction project, everyone has been able to view the construction work from the outside through our web cameras, and we have received lots of great feedback on them. Now with much of the work taking place on the inside, we are sharing some pictures to let you see the progress there, too.

Basement space that will house the cGMP facility.

 
 
 
 
Third floor space that is in the process of being transformed into research labs

 
 
The space that will be turned into the 160 seat 3D auditorium.

View from the second floor landing back toward the west. On the right are a classroom and offices including the dean’s office, at the end will be two high tech conference rooms and on the left will be the experiential education and graduate / research suites.

Newsletter Article – Summer 2011 Edition